EICRs for Brighton & Hove rentals, every circuit tested.
For landlords and letting agents from Portslade to Saltdean. You get a fixed price in writing before we book, we arrange access with your tenant, and the PDF report reaches you within 48 hours of the inspection.
Prices
Report
Interval
Example inspection
Ready to test
Each circuit is switched off, tested, then switched back on.
An illustration of the schedule of test results in an EICR. The readings are typical examples, not from a real property.
What every inspector who comes to your property holds
An inspection and testing qualification (City & Guilds 2391 or equivalent)
Testing to the current IET Wiring Regulations
Shown at the door to you or your tenant
Test instruments with in-date calibration
Given on request, so you can check it yourself
How to check any inspector
Ask which registration scheme they belong to and their number, then look them up on that scheme’s public register or at electricalcompetentperson.co.uk.
What an EICR in Brighton actually checks
An Electrical Installation Condition Report is a full check of the fixed wiring: the consumer unit (fuse board), circuits, sockets, switches, light fittings and anything wired in, such as the cooker, shower and extractor fans. The inspector compares what they find against BS 7671 and records any problem with a code.
Most of Brighton’s rented homes are older than the rules they’re tested against. Victorian terraces in Hanover, Regency townhouses in Kemptown and Brunswick, and 1930s semis in Portslade or Saltdean have often been rewired in parts, extended, then split into flats. An EICR shows whether all of that still adds up to a safe installation.
Sooner if the last report says so.
For C1, C2 and FI items, or less if the report says so.
Damage, overheating, missing covers, unsuitable fittings, bonding and labelling.
That protective conductors and ring circuits are joined up end to end.
That cables aren’t leaking current to earth (damp basements show up here).
That switches and fuses break the live conductor, not the neutral.
That a fault would clear fast enough to prevent a shock or fire.
That residual current devices trip within the required time.
Does your ward need a licence as well as an EICR?
Every private tenancy in England needs a valid EICR. In Brighton & Hove, many lets also need a council licence, and the council’s licence conditions include electrical safety. The position as of October 2026, checked against the council’s pages on 14 October 2026:
Citywide · national rule
Mandatory HMO licence
Five or more people from two or more households sharing facilities, anywhere in the city.
Applies to your choice
Citywide · from 1 July 2024, 5 years
Additional HMO licence
Smaller HMOs of two or more storeys with three or four occupiers, in all 23 wards.
Applies to your choice
In force · 2 Sep 2024 to 1 Sep 2029
Selective licence, 4 wards
Most private lets in Kemptown, Moulsecoomb & Bevendean, Queen’s Park, and Whitehawk & Marina.
Applies to your choice
Designated · due 20 Oct 2026 · paused
Central Hove & Regency
Designated on 6 July 2026, but the council’s page says it is paused while a legal challenge is reviewed. Check with the council before you apply.
Applies to your choice
Check your ward
Your result
- EICR, whatever the ward. A valid report before a new tenancy starts, renewed at least every five years.
- A licence on top? That depends on the ward and on who lives there. Choose both on the left to see which licence, if any, applies.
{ward}
- Mandatory HMO licence. Five or more sharers from two or more households, anywhere in the city.
- EICR, whatever the licence. A valid report before a new tenancy starts, renewed at least every five years.
- Licence conditions usually ask for an up-to-date EICR, so have the report ready when you apply.
{ward}
- Additional HMO licence. Citywide since 1 July 2024 for HMOs of two or more storeys with three or four occupiers.
- EICR, whatever the licence. A valid report before a new tenancy starts, renewed at least every five years.
- Licence conditions usually ask for an up-to-date EICR, so have the report ready when you apply.
{ward}
- Selective licence. {ward} is in the scheme running 2 September 2024 to 1 September 2029.
- EICR, whatever the licence. A valid report before a new tenancy starts, renewed at least every five years.
- Licence conditions usually ask for an up-to-date EICR, so have the report ready when you apply.
{ward}
- Selective licence. {ward} is in the scheme running 2 September 2024 to 1 September 2029, which also covers single-storey flats with three or four sharers that fall outside the HMO schemes.
- EICR, whatever the licence. A valid report before a new tenancy starts, renewed at least every five years.
- Licence conditions usually ask for an up-to-date EICR, so have the report ready when you apply.
{ward}
- Selective licence: on hold. {ward} was designated from 20 October 2026, but the council says the expansion is paused while a legal challenge is reviewed. Check with the council before applying.
- EICR, whatever the licence. A valid report before a new tenancy starts, renewed at least every five years.
{ward}
- No selective licence at the moment. {ward} was in the council’s proposed second phase, but it has not been designated.
- EICR, whatever the licence. A valid report before a new tenancy starts, renewed at least every five years.
{ward}
- No selective licence. {ward} is not in any selective licensing designation.
- EICR, whatever the licence. A valid report before a new tenancy starts, renewed at least every five years.
Guide only. Licence types, exemptions and fees are set by Brighton & Hove City Council.
Not sure which ward the address is in? Give us the postcode and we’ll check it while we price the EICR.
Sources: Brighton & Hove City Council, Selective licensing; council notices for the additional HMO designation (in force 1 July 2024) and the Central Hove and Regency designation (made 6 July 2026). Not legal advice; confirm your property with the council’s private sector housing team.
Brighton & Hove, neighbourhood by neighbourhood
The city’s housing changes every few streets. Each card shows the main thing an inspector looks at there and whether selective licensing applies. Tap “About the housing” for the detail.
West to east across the city
BN41
Licensing proposed
Portslade
Victorian terraces · interwar and post-war semis
Inspector checks
Garages, garden rooms and extensions wired off the house supply over the years.
Victorian terraces in the old village and down by the harbour, with interwar and post-war semis further up the hill.
BN3
No licensing scheme
Hangleton & Knoll
1930s semis · post-war terraces · maisonettes
Inspector checks
Circuits extended many times, and main bonding to gas and water pipes.
Mostly 1930s and post-war semis, terraces and maisonettes, many still on early rewires.
BN3
Licensing proposed
Westbourne, Poets’ Corner & Wish
Edwardian terraces · upper and lower flats
Inspector checks
Which supply feeds which flat, and shared earthing in split houses.
Late Victorian and Edwardian terraces, many converted into upper and lower flats.
BN3
Licensing paused
Brunswick, Adelaide & Central Hove
Regency townhouses split into flats
Inspector checks
Meters in basements or communal halls, and salt air on porch and balcony lights.
Regency and early Victorian stucco townhouses, nearly all split into flats, plus seafront mansion blocks.
BN1 · BN3
No licensing scheme
Patcham, Withdean & Hove Park
1920s–30s houses · loft extensions
Inspector checks
Loft-conversion circuits and outbuildings with long cable runs.
1920s and 1930s detached and semi-detached houses on the edge of the Downs, often extended into the loft.
BN1
Licensing proposed
Seven Dials, Preston Park & Fiveways
Victorian villas · 3–4 flat conversions
Inspector checks
Communal stair lighting and fire alarms that belong to the building, not your flat.
Large Victorian villas and terraces. Conversions into three or four flats are common.
BN1
Licensing paused
Regency, the Lanes & North Laine
Flats over shops · listed buildings
Inspector checks
Shared commercial and residential supplies, and access in pedestrian streets.
Flats above shops and cafés, small cottages, and many listed buildings in the conservation areas.
BN2
Licensing proposed
Hanover & Elm Grove
Two-storey terraces · groups of sharers
Inspector checks
A two-storey house with three or four sharers needs an additional HMO licence.
Steep streets of two-storey Victorian terraces, many of them let to groups of sharers.
BN1 · BN2
Licensing in force
Moulsecoomb, Bevendean & Coldean
Interwar houses · student shares
Inspector checks
Extra sockets and adaptors in bedrooms, and the summer changeover deadline.
Interwar and post-war houses close to the University of Brighton and the University of Sussex, with many student shares.
BN2
Licensing in force
Kemptown & Queen’s Park
Regency squares · seafront flats
Inspector checks
Damp basement flats and long-unmodernised flats in big conversions.
Regency squares and crescents, seafront flats and Victorian terraces running up the hill.
BN2
Licensing in force
Whitehawk & the Marina
Post-war houses · apartment blocks
Inspector checks
In newer blocks, the landlord’s supply and fire alarm are run by the building’s managing agent.
Post-war houses and flats, plus modern apartment blocks at Brighton Marina.
BN2
Licensing proposed
Woodingdean, Rottingdean & Saltdean
1930s houses · bungalows · clifftop homes
Inspector checks
Bungalows with loft rooms, outbuildings and coastal corrosion on outside fittings.
1930s houses and bungalows, clifftop homes and Rottingdean’s old village core. East Saltdean falls under Lewes District Council.
Highlighted cards contain a ward that has a selective licensing designation. Ward boundaries don’t follow neighbourhood names exactly, so use the ward checker above or the council’s address search to be sure.
Inside a Brighton conversion: who is responsible for what
A Regency or Victorian house split into five flats has five landlords’ installations and one set of shared parts. Switch between them, and tap a numbered point to see what the inspector checks there.
Tap a numbered point
Eight places Brighton conversions catch people out
Your EICR covers your flat’s installation from its meter and consumer unit outwards. The shared parts are a separate installation, usually the responsibility of the freeholder or managing agent.
1 of 8 · Shared parts · freeholder or agent
Meters and intake
In converted houses the meters often sit together in the basement or the communal hall. We test your flat from its own meter and consumer unit; the supply up to that point belongs to the network operator and the building.
2 of 8 · Shared parts · freeholder or agent
Stair lighting and fire alarm
Communal lighting, entryphones and the fire alarm are a separate installation run from a landlord’s supply. They need their own checks, arranged by whoever manages the building, unless you let the whole house as one HMO.
3 of 8 · Your EICR
Your flat’s consumer unit
Age, condition and RCD protection of the fuse board. An older plastic board isn’t an automatic fail, but missing covers, scorching or no RCD protection where it’s needed will be coded.
4 of 8 · Your EICR
Bathroom
Showers and electric heaters need RCD protection, and older installations may need supplementary bonding. Lights and fans must suit the zone they’re fitted in.
5 of 8 · Your EICR
Kitchen
The cooker circuit, sockets close to the sink and any appliances wired in. Kitchens squeezed into Regency back rooms often have sockets added on spurs over the years.
6 of 8 · Your EICR
Attic and loft conversion
Later conversions can hide junction boxes under the floor and cables buried in insulation, which can overheat. The inspector checks the circuits run up there were added safely.
7 of 8 · Your EICR, if on your supply
Balcony and outside lights
Sea air corrodes outside fittings fast on the seafront and up the hills. Lights and sockets outdoors need the right weather rating, and outdoor sockets need RCD protection.
8 of 8 · Your EICR
Basement damp
Damp basement flats can show low insulation resistance readings and corroded accessories. The report may ask for further investigation if readings need explaining.
Part of the building
Usually arranged by
Your flat, from its meter onwards
You, the flat’s landlord
Stair lighting, entryphone, communal sockets
Freeholder or managing agent
Communal fire alarm and emergency lights
Freeholder or managing agent (separate tests)
Whole house let as one HMO
The HMO landlord: everything, shared parts included
EICR prices in Brighton & Hove
Prices depend on the size of the installation, not the postcode. Tell us about the property and you’ll have the exact figure in writing before anything is booked.
Studio
Studio flats, including attic and basement studios.
- One consumer unit
- PDF report within 48h
- Tenant access arranged
1–3 bed
One-bed conversions, maisonettes, terraces and flats.
- Every circuit tested
- Coded observations explained
- Renewal reminder
4 bed
Family houses, townhouses and extended semis.
- Extra fuse board £89.99
- Outbuildings on request
- Itemised repair quote
5–6 bed
Large houses and townhouses over three or more floors.
- Extra fuse board £89.99
- Report for your licence file
- Fixed price in writing
Prices cover the inspection, testing and the report. Each extra consumer unit (fuse board) is £89.99. HMOs and homes with seven or more bedrooms are priced on rooms and boards: call for a fixed quote. Any repairs are quoted separately and itemised, and you’re free to take that quote elsewhere.
Five things you get in writing before anyone visits
When you book, the confirmation sets out the price, the visit and what happens after it. Here is what one looks like for a typical two-bed flat.
Booking confirmation
EICR · two-bed flat, Brighton BN2 (example)
Sent before the visit
Questions about a booking: 020 3386 1854
Your EICR price in three taps
Choose the property type and size. The estimator shows the fixed price for your property; we confirm it in writing when you call or send the form.
- Priced per flat. A one-bed in a five-storey Regency conversion is still a one-bed.
- Shared parts are separate. Stair lighting and the communal fire alarm are a separate installation and a separate quote.
- Extra fuse boards are £89.99 each. HMOs are priced on rooms and boards: call for a fixed quote.
An extra consumer unit
A second fuse board, for example in a loft or outbuilding: £89.99
Tenant lives there
We arrange access with them
Your price
£50
£175
£300
Size
Studio
Extra board
Not needed
Access
We arrange it with your tenant
From your call to the report in your inbox
Call or send the form
Tell us the address, the size, and who holds the keys.
Fixed price in writing
Confirmed in writing before anything is booked.
We arrange access
We agree a time with your tenant or agent and confirm it to you.
Inspection and testing
Every circuit checked. The power goes off for short spells only.
Report within 48 hours
The PDF EICR, with every observation coded and explained in plain English.
Quote, then reminder
An itemised quote if anything needs work, and a reminder before the next one is due.
The four codes on an EICR, and what each one means
Every observation in the report gets a code. Any C1, C2 or FI makes the report unsatisfactory; a C3 on its own doesn’t. Choose a code to see what it means for you.
Danger present
Unsatisfactory
Potentially dangerous
Unsatisfactory
Improvement recommended
Doesn’t fail on its own
Further investigation
Unsatisfactory
C1 · Danger present
There is a risk of injury right now, such as live parts you can touch. The inspector should make it safe or tell you immediately. The report is unsatisfactory, and the work can’t wait for the 28 days.
Report outcome
Unsatisfactory
Deadline
Make safe straight away
C2 · Potentially dangerous
Not dangerous this minute, but it could become so, such as missing main bonding or signs of overheating. The report is unsatisfactory: fix it within 28 days, or sooner if the report says so.
Report outcome
Unsatisfactory
Deadline
Within 28 days, or sooner if stated
C3 · Improvement recommended
Doesn’t meet the current edition of BS 7671 but isn’t unsafe. A C3 on its own doesn’t make the report unsatisfactory, and there’s no legal deadline to act on it.
Report outcome
Doesn’t fail on its own
Deadline
No legal deadline
FI · Further investigation
Something the inspector couldn’t confirm during the visit, such as a circuit that can’t be traced. The report is unsatisfactory until it has been investigated, within 28 days.
Report outcome
Unsatisfactory
Deadline
Investigate within 28 days
Usually no code
Not every old feature is a defect. If it’s in good condition and works safely, it may not be coded at all.
Common Brighton findings, decoded
The inspector decides the code on site, so treat these as typical outcomes, not guarantees.
Typically coded C1. This makes the report unsatisfactory until it’s dealt with.
The inspector decides the code on site.
Typically coded C2. This makes the report unsatisfactory until it’s dealt with.
The inspector decides the code on site.
Typically coded C3. Worth planning for, but it won’t fail the report on its own.
The inspector decides the code on site.
Typically coded FI. This makes the report unsatisfactory until it’s dealt with.
The inspector decides the code on site.
Usually no code on its own. Old cable colours aren’t a fault if the cables are in good condition and test well.
The inspector decides the code on site.
Usually no code on its own. Current rules want new boards in homes to be non-combustible, so the inspector may recommend an upgrade (often a C3), depending on where it is.
The inspector decides the code on site.
The rules every Brighton landlord works to
The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 apply to most private tenancies, with or without a council licence.
Duties of private landlords
S.I. 2020/312, as amended by S.I. 2025/1043
- Have the electrical installation inspected and tested by a qualified person at least every five years, or sooner if the last report says so.
- Make sure a valid report is in place before a new tenancy begins.
- Give existing tenants a copy within 28 days of the inspection.
- Give a new tenant a copy before they move in.
- Give a prospective tenant a copy within 28 days of their written request.
- Send the council a copy within 7 days of its written request.
- Keep a copy for the inspector who carries out the next inspection.
- Complete remedial work or further investigation within 28 days (or sooner if specified), then confirm it in writing to the tenant and the council within 28 days of finishing.
The maximum civil penalty per breach. It went up from £30,000 under S.I. 2025/1043, for specified purposes from 1 November 2025 and fully from 1 May 2026.
The council can also arrange urgent remedial work itself and recover the cost from the landlord. Landlords have a defence if they took all reasonable steps, and a tenant refusing access doesn’t by itself mean you’ve failed, provided you can show your attempts.
- Keep a record of the notices you sent, the dates you offered and the tenant’s replies.
- Keep the report and any completion certificates together, ready for the council.
After the inspection: the deadlines
Inspection and testing. The report is issued, and you have it within 48 hours from us.
If the council asks in writing, send a copy within 7 days of the request.
Existing tenants get a copy. C1, C2 and FI items fixed or investigated, unless the report sets a shorter time.
Written confirmation of the completed work to the tenant and the council.
Not covered by the 2020 regulations
- Lodgers who share a home with the landlord
- Long leases of seven years or more
- Student halls of residence, hostels and refuges
- Care homes, hospitals, hospices and NHS accommodation
- Holiday lets (no tenancy, so other duties apply; see below)
What’s changing around it
- Social housing is now covered: new tenancies from 1 December 2025, existing ones from 1 May 2026.
- Renters’ Rights Act 2025: periodic tenancies from 1 May 2026.
- A private rented sector database is expected from 15 December 2026, rolled out region by region (draft regulations).
Source: legislation.gov.uk, S.I. 2020/312. Checked October 2026.
When is your next EICR due?
Enter the date of your last inspection and the interval the report gave. The planner shows how much of that interval you’ve used, the due date, and when to book so there’s time for any repairs.
Your report’s interval appears below
No report yet? You need one before the next tenancy starts.
Plan inspections around the city’s busy months
Brighton’s rental year follows two universities and a busy summer. Book the EICR before the changeover rush, not during it. The chart is a rough planning guide, not data.
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Changeover season, book early
Quieter months
Many student houses for next September are let early in the year. Check your EICR’s date now: it has to be valid on the day the new tenancy starts.
Changeover season. Book the inspection before keys go out, with time left to fix anything urgent.
Pride weekend and peak summer traffic. Allow extra time for parking and access in central Brighton.
Quieter months for occupied lets: a good time to renew early, and to sort licensing paperwork.
Holiday let or tenancy? The rules differ
Brighton has a lot of short-stay flats, and some switch between holiday lets in summer and tenancies the rest of the year. Which rules apply depends on how each period is let.
Tenancy
Covered by the 2020 regulations.
Holiday let
Not covered by the 2020 regulations, because guests don’t hold a tenancy.
Tenancy
At least every five years, or sooner if the report says so.
Holiday let
In practice, insurers, letting platforms and agents often ask for a recent EICR. Many owners follow the same five-year cycle.
Tenancy
Copies to tenants, and to the council on request.
Holiday let
Paying guests bring in fire safety law (the Regulatory Reform (Fire Safety) Order 2005), and you must keep the property safe.
Tenancy
HMO or selective licence depending on ward and occupiers.
Holiday let
Check with the council if the property is also let on tenancies at other times of year.
Tenancy
A valid EICR must be in place before each new tenancy starts.
Holiday let
Any period let on a tenancy, such as an off-season student let, needs a valid EICR before it starts.
Keys, permits and the Lanes: access in Brighton
Parking permits
Much of central Brighton and Hove is in controlled parking zones. If you or your tenant can provide a visitor permit, tell us when you book; it saves time on the day.
Pedestrian streets
In the Lanes and North Laine the kit is carried in from the nearest street with loading, so let us know about rear entrances or side gates.
Keys
Tenant at home, agent’s office or key safe: we arrange it with whoever holds the keys.
Power off, briefly
The power goes off for short periods during testing. Tenants who work from home should know in advance. Fridges and freezers are fine for that time.
Written notice
Give your tenant at least 24 hours’ notice in writing before the visit. The notice writer on this page does the wording.
Flat in the Lanes, no parking, keys with an agent? Tell us when you call and we’ll plan the visit around it.
Tenant notice writer
Fill in the details to get a written notice you can email, text or print.
Dear {tenant},
We have arranged an electrical safety inspection (EICR) at {address} on {date}, between {time}.
The law requires one at least every five years. The inspector will need to reach every room, the fuse board and the meter. The power will be off for short periods, so please save any work in progress.
If this time doesn’t suit, please call {phone} as soon as you can.
This note gives at least 24 hours’ written notice.
{from}
Landlord and Tenant Act 1985, s.11(6): 24 hours’ written notice to enter and view the condition of the property.
Ready for the inspector?
Eight small jobs that make the inspection quicker and stop it being left incomplete. Tick them off as you go.
Nothing ticked yet
Nothing stacked in front of the consumer unit or the meter cupboard.
Especially if it’s in a basement, communal hall or locked cupboard, and who has the key.
At least 24 hours; the notice writer above does the wording.
Plus any certificates for recent electrical work, such as a new board or a rewire.
As far as reasonable, so they can be tested rather than noted as “not accessed”.
Keys and access for anything wired from the house.
Medical equipment, alarms or aquariums, so the inspector can plan around them.
A visitor permit or a loading spot, if you have one.
Brighton EICR questions, answered
Something not covered here? Call and ask; there’s no obligation to book.
Talk to us about your property, your ward or a report you already have.
Do landlords in Brighton & Hove need an EICR?
Yes. Under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, most private landlords must have the electrical installation inspected and tested at least every five years and have a valid report in place before a new tenancy begins. Brighton & Hove’s licensing schemes add their own conditions on top.
How much does an EICR cost in Brighton?
Studio: £95. One to three bedrooms: £118.99. Four bedrooms: £129.99. Five or six bedrooms: £169.99. Each extra consumer unit (fuse board) is £89.99. HMOs and homes with seven or more bedrooms are priced on rooms and boards, so call for a fixed quote. You get the exact price in writing before anything is booked.
Does my Brighton property need a licence?
It depends on the ward and who lives there. HMOs with five or more people need a mandatory licence. Smaller HMOs of two or more storeys with three or four occupiers need an additional licence anywhere in the city. Most other private lets in Kemptown, Moulsecoomb & Bevendean, Queen’s Park, and Whitehawk & Marina need a selective licence until 1 September 2029. Use the ward checker on this page, then confirm with the council.
Is selective licensing starting in Central Hove and Regency?
The council designated both wards on 6 July 2026, with a start date of 20 October 2026. Its selective licensing page now says the expansion is paused while a legal challenge is reviewed. Check the council’s page or ask its private sector housing team before applying or paying a fee.
How long does the inspection take?
A typical flat takes a few hours; a large house or HMO takes longer. The power goes off for short periods while circuits are tested, so let your tenant know in advance.
I let a flat in a converted house. Do I need to test the communal areas?
Your EICR covers your flat’s installation from its own meter and consumer unit. Stair lighting, entryphones and communal fire alarms are usually the freeholder’s or managing agent’s installation, with their own checks. If you let the whole house as one HMO, everything is yours, shared parts included.
What happens if the report is unsatisfactory?
Any C1, C2 or FI item has to be fixed or investigated within 28 days, or sooner if the report says so. You then confirm the work in writing to the tenant and the council within 28 days of finishing. We give you an itemised quote, and you’re free to use any qualified electrician.
Does a holiday let or Airbnb in Brighton need an EICR?
The 2020 regulations cover tenancies, and holiday guests don’t hold one. You still have fire safety duties for paying guests, and insurers and letting platforms often ask for a recent EICR. Any period let on a tenancy, such as an off-season student let, needs a valid EICR before it starts.
Do I need a new EICR for every new tenant?
No. If the current report is still within its interval, you give the new tenant a copy before they move in. You only need a new inspection when the report runs out, or sooner if it set a shorter interval.
Is a plastic consumer unit an automatic fail?
No. Current rules want new consumer units in homes to have non-combustible enclosures, but an older plastic board in good condition isn’t a failure on its own. The inspector may recommend an upgrade, usually as a C3, depending on its condition and where it is.
Can the inspection happen while the tenant is at home?
Yes, and it often makes access easier. Give at least 24 hours’ written notice. If a tenant repeatedly refuses access, keep a record of your attempts: the regulations say that isn’t by itself a breach if you took all reasonable steps.
How quickly will I get the report?
Within 48 hours of the inspection, as a PDF you can forward to your tenant, your agent and the council. Remember the 28-day deadline to give existing tenants their copy.
Get your Brighton EICR price in writing
Three short steps. We call you back with the fixed price, then agree the visit with your tenant or agent.
Address, type, size
Who’s there, when
So we can call you
We only use these details to give you the price and arrange the inspection.
Thanks, that’s with us.
We’ll call you back with your fixed price in writing. In a hurry? Call 020 3386 1854.
We’ll confirm the visit when we call.